Post-Construction Activity Monitoring
Post-construction monitoring will take place for six months after the completion of the installation. High-resolution beach profiles will be obtained quarterly, as well as post-storm, along the entire length of the project site. We expect that the beach profile surveys will be spaced approximately 100 - 150 meters apart. Sand volume calculations and cross shore variation surveys will be performed to assess the success of the project. Measurements will be made to assess updrift and downdrift impacts. Structural inspections of the CEMS® geo-textile systems will also be conducted during this period and video and still photos will be obtained.